{"id":30287,"date":"2026-05-07T06:48:45","date_gmt":"2026-05-07T06:48:45","guid":{"rendered":"https:\/\/wizandroidmz.com\/emprego\/?p=30287"},"modified":"2026-05-07T06:48:45","modified_gmt":"2026-05-07T06:48:45","slug":"vaga-onshore_quality-performance-coordinator","status":"publish","type":"post","link":"https:\/\/wizandroidmz.com\/emprego\/vaga-onshore_quality-performance-coordinator\/","title":{"rendered":"Vaga &#8211; Onshore_Quality &#038; Performance Coordinator"},"content":{"rendered":"<h1 class=\"section-title ng-binding\">About this offer<\/h1>\n<div class=\"section-html-text ng-binding\">\n<p><strong>Activities<\/strong><\/p>\n<p>\u2022 Coordinate the quality interfaces between the Onshore EPC scope and the adjacent cross -discipline scopes \u2014 Site Infrastructure, Marine<\/p>\n<p>Facilities and Onshore facilities interfaces \u2014 ensuring coherent assurance coverage across the full Onshore perimeter.<\/p>\n<p>\u2022 Define and develop the Project quality performance indicator set (KPIs, Cost of Quality metrics, maturity indicators) in coordination with the<\/p>\n<p>Assurance and Integration Manager, and maintain the indicator architecture through the Project lifecycle.<\/p>\n<p>\u2022 Structure and manage the Project quality data architecture \u2014 ensuring integrity, accessibility, traceability and alignment with downstream reporting needs.<\/p>\n<p>\u2022 Improve stakeholder KPI reporting flows to Home Office, ensuring clarity, relevance and alignment with TotalEnergies reporting standards.<\/p>\n<p>\u2022 Support the Assurance and Integration Manager in identifying and implementing integration opportunities where quality assurance flows can be streamlined across packages and disciplines.<\/p>\n<p>\u2022 Deploy the Project Quality Culture programme, in line with CONTRACTOR philosophy, across all Onshore packages and locations.<\/p>\n<p>\u2022 Develop and maintain the Project training matrix for the quality function, ensuring competency coverage matches Project criti cality.<\/p>\n<p>\u2022 Drive team engagement initiatives to build an integrated quality team with a unified Project mindset across all packages and locations (Home Office, Site, Vendor locations).<\/p>\n<p>\u2022 Deploy Lean \/ Kaizen \/ iObeya practices in line with CONTRACTOR philosophy, facilitating visual management, continuous improvement workshops and waste elimination.<\/p>\n<p>\u2022 Support competency development of the quality team through structured training plans, mentoring and qualification tracking.<\/p>\n<p>\u2022 Operate the Project KPI dashboards; monitor performance trends and escalate deviations to the Assurance and Integration Manag er.<\/p>\n<p>\u2022 Track Cost of Quality across the Project \u2014 rework, nonconformity costs, audit findings \u2014 and report trends to management.<\/p>\n<p>\u2022 Manage the Q-Obs (Quality Observations) programme, consolidating field observations into actionable insights and continuous improvement inputs.<\/p>\n<p>\u2022 Conduct trend analysis on nonconformities, derogations, deviations and audit findings; feed outputs into the Assurance and Integration Manager\u2019s reporting line and into the Lessons Learned process.<\/p>\n<p>\u2022 Chair the Lessons Learned committee; maintain the Project Lessons Learned register, ensure structured capture, prioritization and reuse of lessons across Project packages.<\/p>\n<p>\u2022 Govern the Project digital tools supporting quality and performance \u2014 including the Change Management system and the Construction Management System \u2014 with a view to downstream commissioning integration.<\/p>\n<p>\u2022 Act as Project Feedback Representative towards TotalEnergies Headquarters, owning the feedback loop on quality performance, lessons learned and improvement opportunities.<\/p>\n<p><strong>Qualifications\/Experience required<\/strong><\/p>\n<p>\u2022 Degree in Engineering or another relevant subject required with either an advanced degree or professional qualifications preferred.<\/p>\n<p>\u2022 20 years\u2019 experience, 20 years in the field of project management, quality assurance and performance management, lean manufacturing management, compliance, coordination, quality control and quality assurance.<\/p>\n<\/div>\n<p>Apply for this job: <a href=\"https:\/\/app.beehire.com\/invite\/ZjgTpaHy4?form=false\">https:\/\/app.beehire.com\/invite\/ZjgTpaHy4?form=false<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>About this offer Activities \u2022 Coordinate the quality interfaces between the Onshore EPC scope and the adjacent cross -discipline scopes \u2014 Site Infrastructure, Marine Facilities and Onshore facilities interfaces \u2014 ensuring coherent assurance coverage across the full Onshore perimeter. \u2022 Define and develop the Project quality performance indicator set (KPIs, Cost of Quality metrics, maturity [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14588,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[36],"tags":[],"class_list":["post-30287","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-vaga"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/wizandroidmz.com\/emprego\/wp-content\/uploads\/2024\/08\/aldeia.png","_links":{"self":[{"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/posts\/30287","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/comments?post=30287"}],"version-history":[{"count":1,"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/posts\/30287\/revisions"}],"predecessor-version":[{"id":30288,"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/posts\/30287\/revisions\/30288"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/media\/14588"}],"wp:attachment":[{"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/media?parent=30287"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/categories?post=30287"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wizandroidmz.com\/emprego\/wp-json\/wp\/v2\/tags?post=30287"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}